Skip to main content

A180 overnight lane and carriageway bridge closures

3:39 pm, Friday, 21st November 2025 - 4 weeks ago

Highways

There will be two overnight lane closures to enable contractors to cut down vegetation on Alexandra Dock Bridge and Gilbey Road Bridge. The works will start on Friday 28 November on Alexandra Dock Bridge between 7pm and 5am followed by Gilbey Road Bridge on Saturday 29 November between 7pm and 5am.

Additionally, there will be two night closures on Gilbey Bridge between Pyewipe Roundabout and Moody Lane Roundabout on 1 and 2 December.

A pothole appeared in the surface tarmac in September and a temporary patch was done at the time. These works are to provide a more permanent repair. The bridge will be closed from 8pm on both evenings to approximately 6am and will involve a full closure of the bridge to make sure there is a safe and clear working area.

A diversion will be in place from the Moody Lane roundabout to Pyewipe Roundabout while the works are undertaken. The road will be opened as soon as possible each night.

Northern Powergrid will also be completing some work on Alexandra Dock Bridge in December under lane closures. Keep an eye out for signage prior to works for more information.

Next Article
Stay safe this winter – Road safety tips for everyone
With winter here and temperatures dropping, it’s more important than ever to stay safe on our roads. Dark mornings, early evenings, and icy conditions can make journeys more challenging, but...
Previous Article
Vital upgrades and maintenance set for Grimsby junction
Improvements are set to be carried out at a Grimsby junction to make the area safer for motorists and pedestrians. A box junction will be added at the junction of...

Share this article