Skip to main content

Delayed carriageway resurfacing and road markings work on Pelham Road due to weather conditions

10:06 am, Friday, 1st December 2023 - 6 months ago

General

Plans for carriageway resurfacing and road markings works on Pelham Road, between Habrough Road and Washdyke Lane, have been postponed due to the cold weather.

The cancellation dates for the overnight road closures are detailed below:

  • Thursday 30 November – Road closure between Habrough Road and Thornton Place.
  • Friday 1 December – Road closure between Thornton Place and Washdyke Lane.
  • Monday 4 December and Tuesday 5 December – Road closure between Habrough Road and Washdyke Lane.

The works will resume when conditions are suitable for the surfacing operation and the contractor will be regularly checking the weather forecast to enable swift reprogramming of the works when suitable temperatures are forecast.

The Council, Equans and contractor EC Surfacing Ltd would like to apologise in advance for any inconvenience this has caused.

Next Article
Temporary closure of Abbey Walk Car Park
ABBEY Walk multi-storey car park in Grimsby Town Centre will be temporarily closed from this evening (Wednesday 15 May) as a precautionary measure, following the findings of a pre-planned structural survey. As soon as the last vehicle leaves the car park, the three-storey 427-space facility will be closed. This is to ensure safety and to...

Share this article