Skip to main content

Wintringham Road underpass closure

9:15 am, Monday, 4th September 2023 - 9 months ago

General

North East Lincolnshire Council and its delivery partner, Equans, are carrying out works to repair and replace the low bridge chevron signs on the underpass.

The works will be carried out for one day only on Wednesday 13 September between 9am and 3.30pm. During this time, the underpass will be closed. Advanced warning and diversion signs will be in place. Footpath access will still be maintained.

Although every effort will be made to minimise disruption, some of the engineering work can be noisy. Access for emergency vehicles will be maintained at all times.

The council, Equans and contractor McCann’s would like to apologise in advance for any inconvenience and assure you that the work will be completed as quickly and safely as possible.

Next Article
Temporary closure of Abbey Walk Car Park
ABBEY Walk multi-storey car park in Grimsby Town Centre will be temporarily closed from this evening (Wednesday 15 May) as a precautionary measure, following the findings of a pre-planned structural survey. As soon as the last vehicle leaves the car park, the three-storey 427-space facility will be closed. This is to ensure safety and to...

Share this article