Menu
Skip to main content

Local Plan evidence base


The Local Plan review commenced in 2022 evidence document underpinning the review can be found in the Planning Policy Library below. Documents are grouped by the themes in the Local Plan for ease of reference. Clicking on each theme will reveal the documents available.

If you have any issues with these documents relating to accessibility, please contact Spatialplanning@nelincs.gov.uk.

DocumentDate Published
Humber flood risk management strategy
Summary document (PDF, 2MB)

Part 1 (PDF, 21MB)
Part 2 (PDF, 7MB)
March 2008
Grimsby and Ancholme Catchment Flood Management Plan (2009) (PDF, 9MB) December 2009

Further information about the Catchment flood management plans can be found on Catchment flood management plans – GOV.UK
Flamborough Head to Gibraltar Point Shoreline Management Plan (SMP3)2010
Details regarding the SMP3 are available on the Environment Agency website
Low carbon and renewable energy capacity in Yorkshire and Humber
Final report (PDF. 10MB)
Appendices (PDF, 19MB)
11 April 2011
Local Flood Risk Management Strategy (PDF, 12MB) February 2015
North East Lincolnshire Council Net Zero Carbon Roadmap (PDF, 4MB) 2021
Strategic Flood Risk Assessment 2022September 2022
Humber River Basin District Flood Risk Management Plan 2021 to 2027 (PDF, 50MB) December 2022
Further information about the flood risk management plans 2021 to 2027 can be found on Flood risk management plans 2021 to 2027 – GOV.UK
Draft Water Cycle Study (PDF, 3MB) August 2026
Strategic Flood Risk Assessment
Draft SFRA Level 1 Addendum
Draft SFRA Level 2 Addendum
27 August 2026 DRAFT
DocumentDate Published
A Vision for Allotments, An Allotment Strategy, 2011-2016 (PDF, 1MB) 2011
Lincolnshire Historic Landscape Characterisation Project
The Historic Character of the County of Lincolnshire (PDF, 36MB)
The Historic Landscape Character Zones (PDF, 15MB)
September 2011
North East Lincolnshire Landscape Character Assessment 2010 (PDF, 3MB) 2010
North East Lincolnshire Landscape Character Assessment 2015
Sections 1-4 (PDF, 2MB)
Sections 5-6 (PDF, 8MB)
Section 7 (PDF, 21MB)
Appendices (PDF, 8MB)
12 November 2015
South Humber Industrial Investment Programme (PDF, 1.5MB) January 2016
South Humber Gateway Ecological Mitigation North East Lincolnshire Delivery Plan (2019) (PDF, 2MB) January 2019
Playing Pitch Strategy 2020 – 2032 (PDF, 2MB) July 2020
South Humber Gateway Mitigation Contribution Justification Statement (PDF, 466KB) 6 December 2023
Tree Strategy
Part One (PDF, 11MB)
Part Two (PDF, 5MB)
Part Three (PDF, 2MB)
Part Four (PDF, 3MB)
Part Five (PDF, 15MB)
June 2023
Joint Strategic Needs Assessment (JSNA) State of the Borough summaryMarch 2024
Joint Health and Wellbeing Strategy 2025-2035 (PDF, 6MB) 2025
Green and Blue Infrastructure Strategy (PDF, 7MB) May 2026
Greater Lincolnshire Nature Recovery Strategy (PDF, 20MB) July 2026
Further information about what a Local Nature Recovery Strategy is and to view maps related to the Strategy please visit the Greater Lincolnshire Local Nature Recovery website
Landscape Character Assessment, Sensitivity and Capacity Study
Sections 1 to 4
Section 5
Section 6
Section 7
Section 8A
Section 8B
Section 9
July 2026
Open Space Assessment – Interim findings from accessibility and quantity analysis (PDF, 1MB) July 2026

Sustainability Appraisal

A Sustainability Appraisal and Strategic Environmental Assessment must be carried out at each stage of preparing a new local plan or reviewing an existing local plan. These two legal requirements have been met through one integrated process and a report prepared called the Sustainability Appraisal.

The purpose of the Sustainability Appraisal is to identify and report on the likely social, economic and environmental effects of the plan and the extent to which sustainable development is expected to be achieved through its implementation.

There are five main stages to preparing a Sustainability Appraisal, these are:

  1. Setting the context and objectives, establishing the baseline and deciding on the scope of the appraisal (Scoping report)
  2. Developing and refining options and assessing effects
  3. Preparing the sustainability appraisal report
  4. Consulting on the emerging local plan and the sustainability appraisal report
  5. Monitoring the significant effects of implementing the local plan

2026 Pre-Submission Draft Local Plan

2025 Preferred Options consultation

The 2025 Sustainability Appraisal (PDF, 13MB) was published in accordance with Regulation 13 of the Strategic Environmental Assessment Regulations for consultation with the prescribed statutory bodies and the public.

The consultation period ran from Monday 8 December 2025 to Sunday 1 February 2026. All comments needed to be received by 23:59 on Sunday 1 February 2026.


2024 Draft Plan consultation

This 2023 Sustainability Appraisal (PDF, 15MB)  has been published in accordance with Regulation 13 of the Strategic Environmental Assessment Regulations for consultation with the prescribed statutory bodies and the public.

The consultation period ran from Monday 15 January to Friday 8 March 2024. Any comments needed to be received by 5pm on Friday 8 March 2024.


2023 Scoping consultation

This Sustainability Appraisal Scoping Report (PDF, 9MB) was published for consultation with the prescribed statutory bodies.

The consultation with Natural England, Historic England, and the Environment Agency ran from Friday 6 February to Friday 17 March 2023.

The purpose of this consultation is to seek their views in relation to the scope and level of detail to be included in the Sustainability Appraisal of future stages of the local plan review.

There following iterations of the Sustainability Appraisal published during the preparation of the existing 2018 Local Plan. These have been retained below for information and completeness:


Habitat Regulations

The objective of the Habitat Regulations Assessment is to determine whether the emerging local plan is likely to have a significant effect on the achievement of the conservation objectives of the European and International conservation sites within and around the area. These sites include:

  • Special Protection Areas (SPAs) for birds classified by the ‘1979 Wild Birds Directive’
  • Special Areas of Conservation (SACs) for other habitats and species designated through the ‘1992 Habitats Directive’
  • Ramsar sites, which are internationally important wetland areas designated under the ‘Ramsar Convention’

The Habitat Regulations Assessment feeds into the Local Plan review and has undergone the following consultation:

2025 Preferred Options consultation

The 2025 Habitat Regulations Assessment Report (PDF, 5MB) was published for consultation with stakeholders and the public.

The consultation period ran from Monday 8 December 2025 to Sunday 1 February 2026. Any comments needed to be received by 23:59 on Sunday 1 February 2026


2024 Draft Plan consultation

This 2023 Habitat Regulations Assessment Report (PDF) was published for consultation.

The consultation period ran from Monday 15 January to Friday 8 March 2024. Any comments needed to be received by 5pm on Friday 8 March 2024.

The report presents the methodology and findings of Stage 1: Screening. If Appropriate Assessment is required, this will be conducted at the next stage of the Local Plan review process.

There were three iterations of the Habitat Regulations Assessment prepared as part of the existing 2018 Local Plans preparation. These have been retained below for completeness:


Contact details